Aviation Industry Procedures

Order Description Complete a 1500 word structured ‘Business Continuity Report’ to explain the management of the recovery of airport business functions following an unpredicted event: “The unpredicted event is the loss of two (2) x ray machines in the arrivals area of the airport followed by the loss of electrical power across the entire airport.” Special Conditions: 1. There is no spare x-ray machines 2. Electrical contractors have replaced the wiring but made a mistake with the main electrical input to the airport. The repair to wiring will take approx. 4-6 hours 3. You need to solve the problem to ensure passenger safety and airport security