Determination of Critical Path of a Project

Use the forward and backward pass method to calculate project duration, based on the assumption that the expected duration of each activity can be calculated using the following formula: Expected Duration = (Pessimistic Duration + 4 x Most Likely Duration + Optimistic Duration)/6. Include slack on the arrows and identify the critical path(s) and burst and merge activities.

Evaluate the finished project and write a review of your analysis and how you completed each step. Include the completed table and your AON diagram in your paper

Sample Solution