Integrated scheduling and cost management
Develop a Work Breakdown Structure (WBS) and project schedule in a Gantt format for the E-Mail Upgrade Project described in the scenario.
1.0 Evaluate User & System Requirements
2.0 Evaluate ODHS Network Suitability
3.0 Conduct E-mail System Selection
4.0 Upgrade ODHS Network & Hardware
5.0 Develop E-mail Training
6.0 Deploy E-mail System