Write an invitation letter to contractors to construct a school with capacity of 1000 students. (Not more than 3
pages)
Owner – Lujain AlHarbi
Contractors – Saudi Bin Laden Group
Location – Jeddah, Saudi Arabia
Area – 10,000 meters squared
Floors – 2 floors, with roof top activity centers
Materials:
Sustainable and environmentally friendly building-
The stones covering the facade are locally sourced
The insulation is made of hemp, panels were naturally installed on the roof, as the area receives a lot of sun.
Beyond the environmental basics, it’s a contemporary, bold, powerful and dynamic architectural structure
Sample Solution